Work Completed
|
Nu-Way NGN 125 installed at the Royal Bank of Scotland "London" on a B&E windsor rated at 2500KW |
Gas Booster set with auto change in case of fault. These are GB3500 pumps built as a package unit. |
|
Nu-Way MGL360 Propane burners installed at the Maldon Salt Company. We have installed 12 of these burners at the site over the last 2 years, We service all the companys burners on 2 sites, a total of 19 salt pans. |
MHS Strata 111 330 boilers installed in a central London 27 floor tower block, WE service a total of 12 of these units on site. |
|
Nu-Way Dual fuel NGNL 125 Natural Gas & Propane with Autoflame control. |








